The work on the development of PD and RD at the automated process control system of the mill and fuel and lubricants warehouse for Polyus Magadan JSC
Based on the results of the tender, Industrial Automation LLC was recognized as the winner and entered into an agreement for design work for Polyus Magadan JSC. In a very short time from December 2019 to January 2020, the specialists of the design department of the Company developed the Design and Working Documentation on the following topics:
1. Technical re-equipment of a hazardous production facility, a mill plant in terms of process control devices in the mineral processing scheme.
2. Technical re-equipment of process control devices of the fuel and lubricants warehouse of JSC Polyus Magadan.
The scope of work amounted to:
— Modernization of the top-level storage system of the control system of the ZIF (increase in disk space and storage of backup copies of servers and software).
— Automation of the separation of grinding and gravity of the mill. Accounting for water resources.
— Automation of water quality control and monitoring of the quality of water taken from the tailings at the workstation of the dispatcher of the mill.
— Temperature control of bearings and motors of pumps and other equipment that are not covered in the “Industrial control system 1 stage of construction”.
— Transfer control panels of concentrators of the 3rd stage from the shield instrumentation to the concentrators in place. Organization of communication “frequency converter — control cabinet of the concentrator” at the third stage of gravitational enrichment.
— Automation of control of drainage pumps.
— Automation of control of drives and reducers of feeders, drive and gear of conveyors.
— Automation of the drainage pump installation of water supply from the river. The schemer ZIF NGOK.
— Organization of communication networks with the control system of the fuel and lubricants warehouse with the data center ABK ZIF.
— Automation of pumping fire water supply.
— Automated lighting control system.
All work was completed in full on time.